What is OEE (overall equipment effectiveness)?

OEE, overall equipment effectiveness, is a single percentage that shows how much of a machine's planned production time is turned into good parts at the intended speed. It is availability multiplied by performance multiplied by quality. An OEE of 100 percent means no stops, no slow cycles and no defects. In practice it is a way to find where a machine's time goes.

By Arunkumar V, CTO · 03 November 2026 · 3 min read

  • overall equipment effectiveness
  • OEE formula
  • how to calculate OEE
  • OEE for small manufacturers

The three factors

Availability is run time divided by planned production time; it drops with breakdowns, setups and waiting for material. Performance is actual output divided by what the machine should have produced in that run time at its ideal cycle time; it drops with slow cycles and minor stops. Quality is good parts divided by total parts; it drops with scrap and rework. Multiply the three and you have OEE. The figure matters less than the three factors, because each points at a different kind of loss and a different fix.

A worked example

Take a press brake with an eight-hour shift and a 30-minute planned break, so 450 minutes of planned production time. It loses 60 minutes to a setup and a breakdown, leaving 390 minutes of run time: availability is 390 divided by 450, which is 86.7 percent. Its ideal cycle is one part a minute, so 390 parts were possible; it made 350: performance is 89.7 percent. Of those, 340 were good: quality is 97.1 percent. OEE is 0.867 times 0.897 times 0.971, about 75.5 percent. The numbers are illustrative, but the arithmetic is the whole method.

The six big losses

OEE is usually taught alongside the six big losses, which map onto the three factors and tell you where to look first. Breakdowns and setups eat planned time before a single part is made. Minor stops and reduced speed are the quiet losses: the machine looks busy but produces less than its cycle time allows. Rejects at start-up and in steady production cost the material and the time already spent on them.

  • Breakdowns (availability)
  • Setup and adjustment (availability)
  • Minor stops and idling (performance)
  • Reduced speed (performance)
  • Start-up rejects (quality)
  • Production rejects (quality)

Measuring it in a small shop

You do not need sensors to start. For one bottleneck machine, record on the job card the planned time, the start and stop of each run, the reason for each stop, the count produced and the count rejected. A week of that gives a believable OEE and, more usefully, a list of stop reasons by minutes lost. Fix the biggest reason, measure again. Compare a machine with itself over time rather than with a published benchmark; an OEE of 85 percent is often cited as world class, but a shop's own trend is the number that drives decisions.

Where ZMOS fits

ZMOS records the inputs OEE needs for sheet-metal, machining and fabrication shops of 10 to 50 people: labour and time logged at work centres against work order routing steps, quantities produced and scrap on the job, and inspection results with NCRs linked to items and jobs. Zudo AI can calculate from workspace data with its library of 217 manufacturing formulas, within the user's role. It is not a machine-monitoring or MES product, so it does not read signals from the machine itself; a plant that wants automatic cycle counting and live downtime capture needs sensors or an MES alongside it.

What ZMOS does

People also ask

Short answers, each one complete on its own.

Related answers

Inside ZMOS

Zudo AIStock ledgerLow-code forms and rulesBarcode job cardsRoles, audit log, APISecurityFree trialWhy Zudo Works

What is a good OEE?

An OEE of 85 percent is commonly cited as world class, and many shops measuring for the first time find figures well below that. The useful comparison is your own machine against last month, and the breakdown of which factor is lowest.

Should a small shop measure OEE on every machine?

No. Measure it on the bottleneck, the machine that sets the pace for the whole shop. Improving OEE on a machine with spare capacity changes nothing. Once the bottleneck improves, the constraint moves and so does the measurement.

How is OEE different from utilisation?

Utilisation is simply the share of available time a machine is running. OEE also counts whether it ran at the right speed and made good parts. A machine can show high utilisation and poor OEE if it runs slowly or makes scrap.

Does planned downtime count against OEE?

Not in the standard calculation. Planned breaks, planned maintenance and periods with no scheduled work are removed from planned production time before availability is calculated. Setups, however, count as availability loss, which is why setup reduction raises OEE.