Title: Job Costing Software for Small Machine Shops | ZMOS
URL: https://zudoworks.com/zmos/job-work-and-costing/
Description: ZMOS job costing: material at real cost plus labour at your work-centre rate, per job and per unit, on the job card the day it closes. Job work included.
Updated: 2026-11-03

# Know what every job cost before month end

Material is issued to the job at the item's real cost; labour is logged per work centre at the rate you set. You know what every job cost: the job card shows material, labour and total cost, per job and per unit, the day the job closes, not when the accountant gets to it.

[Try ZMOS free](https://app.zudoworks.com/signup) [WhatsApp +91 63843 53382](https://wa.me/916384353382?text=Hi%20Zudo%20Works%2C%20I%27d%20like%20to%20discuss%20a%20project.)

- Material at real cost, labour at your rates
- Cost per job and per unit on the card
- Job work: material sent out and returned
- Quotes that start from the BOM cost

![ZMOS work order form with part, quantity, due date and routing](https://zudoworks.com/Asset/img/zmos/work-order-form.webp)

A work order in ZMOS; the job card prints from here. Sample data.

## A worked example from the sample workspace

Job cost example

| Line | Quantity | Rate | Cost |
| --- | --- | --- | --- |
| SHT-2MM Sheet 2 mm S275, issued | 12.6 KG | ₹250 / KG | ₹3,150 |
| BOLT-M8, issued | 60 EA | ₹10.50 / EA | ₹630 |
| Labour at LASER-1 | 4.5 h | ₹450 / h | ₹2,025 |
| **Total for 10 EA of PNL-300** |  |  | **₹5,805** |
| Per unit |  |  | ₹580.50 |

Sample data; every figure adds up. Rates are set per item and per work centre in your workspace.

## How costing works

1. **Material**

   Every issue to a job carries the item's current cost; returns credit the job. Over-issue and items not on the BOM need a reason.
2. **Labour**

   Hours logged per routing step at a work-centre rate. Change the rate and new entries use it; old entries keep theirs.
3. **Job work and subcontracting**

   Send material out against a job-work challan, receive the finished operation back, and keep the subcontractor's charge on the job.
4. **Quotes**

   A quote line can start from the BOM material cost and your labour estimate, so the margin is visible before you send it.

## What it is not

ZMOS gives you actual job cost; it does not do standard costing with variance analysis or activity-based overhead allocation.

- Standard costing and variances: no
- Overhead allocation: not automated
- Actual material + labour per job: yes

Watch it work

## See this part of ZMOS on video

Recorded in the product itself, narrated in English, start to finish.

[![Video thumbnail: Chapter 10. Production: planning, jobs and job costing](https://zudoworks.com/Asset/img/zmos/work-order-form.webp)Chapter 10. Production: planning, jobs and job costing](https://www.youtube.com/watch?v=X_AptIFS1Jo&t=2375s)

39:3510. Production: planning, jobs and job costing

Planning, opening and closing a job, and the job cost it produces. The clip starts at this chapter of the full two-hour build; every step is on sample data and the current version.

[All 38 chapters and the 20-minute tour](https://zudoworks.com/zmos/videos/)

## Questions

How does ZMOS calculate job cost?

Material issued at the item's current cost plus labour hours at the work-centre rate, per job; per-unit cost is the total divided by the quantity made.

Can I see cost while the job is open?

Yes. The job card shows cost to date; it is final when the job closes.

Does it handle job work (subcontracting) in India?

Yes: material sent out and received back against the job, with the subcontractor's charge added to the job cost. GST documents stay in your accounting package or in ZMOS accounting.
